Oore CI
Build and distributeRun builds

Cancel a build

Cancel queued or active work and verify the build reaches canceled.

Cancel one build without changing its pipeline or repository. Oore accepts cancellation while the build is queued, scheduled, assigned, or running.

What you need

  • Project developer, maintainer, instance admin, or instance owner access.
  • A build that has not reached a terminal state.

1. Open the build

Open Builds or the project’s build list, then select the build you want to stop.

2. Confirm cancellation

Select Cancel Build. In the confirmation dialog, select Cancel build.

Oore marks the build canceled immediately. A Direct macOS runner that already claimed the job observes that state and stops its work. Already-recorded logs remain available until retention cleanup removes the build; an incomplete artifact may be unavailable.

Verify the result

The build detail shows canceled, and the cancel action is no longer available.

Troubleshooting

The cancel action is not shown

The build may already be succeeded, failed, canceled, timed_out, or expired, or your project role may not allow cancellation.

A repeated cancellation returns a conflict

The cancellation has already won or another terminal transition completed first. Refresh the build and use its current state; Oore returns invalid_transition instead of changing a terminal build again.

The HTTP contract is available in Cancel a build.

Next step

Use the build-state reference to interpret the terminal result.